Doug,
you’re not “screwed” but the nail gun did get loaded up and put to ready
When you install PMS on DSM 7, the following should have happened.
- DSM 6 gets removed
- The installer starts making you jump through hoops with Permissions settings to get everything right. (which, during the final step of ‘customize’, can take a while but then succeed)
- The last part of that install is the actual “migrate”.
- During part 2 of migration, it checks all the metadata to make certain no old/bad agent data is stored. (this takes a while again)
- When that’s done, the actual move into DSM 7 takes bout 3 seconds.
Did you get a change to review the DSM 7 Migration steps in
(Post #6 is the important one which shows the steps and pop-up after each step)